top of page

PROJECT: SEAWAY GUARDIAN

Project: Deck Winterization of Vessel

Type: Tundra 3600 Design (Robert Allen), Icebreaking Tug

Client: Electro Plastics, Inc.

Owner: Saint Lawrence Seaway Development Corporation (SLSDC)

Year: 2019

Location of Install:  USA

Deployment: USA

 

Scope of Supply

  • Design

  • Onsite Survey

  • Arctic Pad® Low Voltage Traction Mat

  • Installation Support

Project Description

​

The 118ft Seaway Guardian, a massive, muscular well-equipped ice breaking tug replaced the 61 year old Robinson Bay.  This new vessel will perform icebreaking, barge handling duties and aid in navigation for the Unites States100 mile section of the 2,300 mile marine highway. 

​

This design included custom curves for an exact fit.  AMS® Arctic Pad LV (low voltage) are a thinner industrial heated traction mat.   These heated mat are both durable and easily installed.  

SLSDC

SLSDC

SEAWAY GUARDIAN

SEAWAY GUARDIAN

CUSTOM CURVES

CUSTOM CURVES

ELECTRO PLASTICS

ELECTRO PLASTICS

GULF ISLAND SHIPYARD

GULF ISLAND SHIPYARD

ARCTIC PAD LOW VOLTAGE

ARCTIC PAD LOW VOLTAGE

bottom of page