PROJECT

Norman Skud (previously known as Rem Arctic)

Project: Rem Arctic

Type: PSV, Platform Supply Vessel

Client: Kleven Maritime AS

Owner: Rem Offshore ASA

Year: 2015

Location of Install: Ulstenvik, Norway

Deployment: North Sea, Norwegian Sea, Barents Sea 

 

Scope of Supply

  • Arctic Pad®

  • Arctic Tread

  • Onsite Survey

  • On-site Mechanical Installation & Support: 4 Days

  • Electrical Installation Support

  • Commissioning: 1 Day

Project Description

The Arctic Pad® was selected at nearly the last minute for REM Offshores' new-build under construction at the Kleven Verft shipyard. The package scope was to provide anti-icing and de-icing per the 2013 DNV Winterization Guidelines for safe access to escape routes and lifesaving equipment from all points on the vessel. The scope of supply also included installing the Arctic Pad® through the cargo rails from bow to stern. As there was other non-related winterization equipment being installed on the vessel there was an existing control system in place.

 

Special Note

  AMS® excelled at delivery, with the short timeframe in which to work with, this project is a prime example of AMS’s rapid supply and installation capabilities.

  • Average Mechanical Install Time: 5 MINUTES PER SQUARE METER