top of page

PROJECT: LEIV EIRIKSSON

Project: Leiv Eiriksson

Type: 5th Generation Deep Water Semisubmersible Drilling Rig -

          Harsh Environment

Client: GMC Maritime

Owner: Ocean Rig

Year: 2016

Location of Install: Norway

Deployment: Barents Sea, North Sea, Norwegian Sea

 

Scope of Supply

  • Arctic Pad®

  • Arctic Treads

  • Onsite Survey

  • On-site Mechanical Installation & Support

Project Description

​

The Arctic Pad® was chosen and installed for the winterization of escape routes, walkways and stairways.  The requirement per DNVGL Offshore Winterization Rules required anti-icing capabilities of a design temperature of -25°C atop expanded grating.  Specific attention was placed on winterizing the escape routes, walkways, stair wells and muster stations.  The crew was so impressed on how easy and fast the installation occurred.

 

Below you will see the AMS® difference which displays the advanced technology and design of our industrial heated matting:

  • Arctic Pad® with Photo Luminescent Markings

  • Each mat embossed with numeric ID

  • Non-skid Coating

  • High Traction Non Slip Surface

  • Built to order in size, shape, heat output, etc. 

OCEAN RIG

OCEAN RIG

HEATED STAIRWAY & WALKWAY

HEATED STAIRWAY & WALKWAY

GLOW IN THE DARK

GLOW IN THE DARK

LEIV EIRIKSSON

LEIV EIRIKSSON

ARCTIC PAD & TREADS

ARCTIC PAD & TREADS

MUSTER STATION POINT

MUSTER STATION POINT

ARCTIC PAD & TREAD

ARCTIC PAD & TREAD

GMC MARITIME

GMC MARITIME

LE Platform

LE Platform

LE Pathway

LE Pathway

MUSTER STATION AT NIGHT

MUSTER STATION AT NIGHT

bottom of page