PROJECT: HEBRON WINTERIZATION
Project: Hebron, Winterization of Pathways
Type: GBS - Offshore Platform
Client: ExxonMobil
Owner: ExxonMobil
Year: 2019, 2020
Deployment: Offshore Newfoundland, Canada
Scope of Supply
-
Design
-
Electrical Engineering
-
Arctic Pad®
-
Arctic Pad® Drainage Mats
-
AMS® Arctic Blankets
-
Ex Control Panel and Monitoring
-
Electrical Accessories
-
Custom Cable Covers
-
Custom Channels
Project Description
AMS® was awarded this project as the leading experts in deck winterization along with our prior history of outfitting the drill floor. The scope of this project was to provide a complete winterization package for a high traffic area where ice and snow accretion was a consistent hazard. We engineered and designed a couple of systems, all of which had to be rated for Ex environments.
The first was achieved by the installation of Arctic Pad® on existing walkways. We custom manufactured every aspect to fit the requirements of size, shape, drainage, mounting, ambient temperature, cold channel routing, Ex environment, etc. Arctic Pad© is the only product on the market that can check all the boxes.
The second was to engineer an Ex, portable stainless steel control panel and to program the intelligent monitoring system. The system effectively operate at 25% as Arctic Pads are cycled on/off for maximum efficiency, by incorporating RTD's with the pads.
The next was to design and produce a custom tailored AMS® Arctic Blanket for the BOP. This product would effectively keep the BOP at the optimal temperature in any weather condition.
![]() | ![]() HEBRON | ![]() EX CABINET | ![]() HEATED WALKWAYS | ![]() CUSTOM CABLE CHANNELS |
---|---|---|---|---|
![]() CABLE CAP | ![]() CABLE TRAY | ![]() CABLE TRAY | ![]() SAFETY AT NIGHT | ![]() WINTERIZATION EXPERTS |
![]() INTELLIGENT | ![]() CUSTOM HEAT | ![]() NO WELD MOUNTING |